Construction & Roofing

Construction & Roofing Freight That Hits the Window

The crew is on the clock before the truck arrives.

Roofing systems, building materials, supplies for the next phase. When a delivery misses the jobsite window, the crew stands around and the schedule slips behind it.

On the jobsite

A jobsite is not a loading dock

You're delivering to a gravel lot or a half-built structure, not a warehouse with a dock and a forklift standing by. The receiving window is whatever the superintendent says it is, and a truck that rolls in two hours late finds a crew waiting on someone's payroll.

A driver who has never worked a site burns the clock figuring out where to put the load. That is why Moffett delivery, a truck-mounted forklift that rides with the freight, is one of our deepest specialties. Your material comes off at the curb even when there is nothing on site to unload it. That one detail is the difference between a fifteen-minute drop and a driver circling the block.

Contractors, roofing suppliers and building-materials distributors all run on the same math. The delivery either lands when the crew can receive it, or it costs somebody a day. We plan the drop around the site and its conditions, not around whatever is easiest for the truck. The best delivery is the one nobody on the crew has to think about.

What we deliver to site

  • Roofing systems, shingles and underlayment
  • Fasteners, coatings and accessories
  • Lumber, framing and engineered wood
  • Drywall, insulation and board
  • Bagged and palletized building materials
The delivery plan

Timed to the site, phased to the build

Deliveries land in the window the crew is standing in, and roll out in phases as the build progresses. Across all shipments, updated quarterly, 98.5% of pickups and 98.6% of deliveries land on time. Last updated 06/30/2026

  • Delivery timed to the site's receiving window and confirmed with the super before dispatch
  • Moffett offload at the curb where there's no dock and no forklift on site
  • Flatbed for banded bundles and oversized material, with tarping specified at booking
  • Phased releases scheduled to the build, so material shows up as each stage needs it, not weeks early in the mud
  • LTL for partial and replenishment loads without paying for a full trailer
  • Gravel, mud and tight-street access briefed to the driver before the truck rolls
  • One point of contact who learns your sites, your suppliers and your release schedule

In their words

★★★★★

"I have been doing business with Fello now for a little over a year. They have been the best logistics team I've ever worked with. When problems do arise, which in the logistics industry they inevitably do, they do whatever it takes for the problems to be resolved quickly and efficiently!"

Luke McGuireManaging Partner, McGuire Roofing Products
Talk to an expert

Tell us what's headed to the site

Walk us through the next phase and the site conditions. You'll be talking to someone who has run jobsite deliveries on gravel before.